SELECTED WORK: ROOFING – Education

PROJECT DESCRIPTION

The re-roofing project on the William Henry Harrison High School in West Lafayette, Indiana involved the steep-slope roof areas totaling approximately 15,000 square feet. The existing metal panel finish had deteriorated and surface rusting was occurring at the seams. The new roof system features 4-inches of rigid insulation, a 1/2-inch plywood and synthetic underlayment followed by the installation of a distinctive 24 gauge prefinished galvanized architectural standing seam metal roof.

  • Owner: Tippecanoe School Corporation
  • Location: West Lafayette, Indiana
  • Lead Consultant: Greggory H. Nichols, RRC, RRO
  • STR/SEG Design Team: Randy Marquardt
  • Project Budget: $250,000.00
  • Completion Date: 10/15/2010